The meeting was called to order by John Brandemuehl, Chairman at 8:09 am. Board
members present in addition to the Chairman were Peg Walsh, and Jim Steiger. Others
present were Lynda Schweikert, Jeff Krueger, Robert Keeney, County Board Chair, Eric &
Linda Van Natta.
Certification of Open Meeting Law:
Janet sent the agenda to Karla Schwantes to post at the Administration Bldg as well as the
County Courthouse and was sent to the Herald Independent for two weeks. Motion by Peg,
seconded by Jim to confirm the certification of the open meeting law. Motion carried
Approval of Minutes:
Peg motioned and Jim seconded to approve the September 25th, 2014, BOA minutes.
Motion carried
Public Hearing:
John opened the public hearing for Eric & Linda Van Natta. Linda presented documentation
relating to the installation of the septic system and the subsequent land purchase to provide
the necessary space for the septic system. She also explained the process they went
through to get a joint agreement on the septic system because the property line went through
the septic system. She pointed out that the zoning/sanitation office knew of the line at that
time and wanted to know why it wasn’t addressed then as opposed to now. Linda submitted
into record the initial survey before the lots we re split as well as a letter from Mound City
Bank stating that they required the lot be split.
There was much discussion on the permitting of the garage. Van Natta’s stated that they
were told by the township that they did not need a permit to build the garage + or – 10 years
ago. If they moved the garage the lot line could be drawn in according to the zoning
ordinance.
Lynda Schweikert read through the criteria they were limited to, to make their decision. The
BOA deliberated a long time on each of the criteria.
The Ellenboro Town board voted in favor of this Variance on 2/5/14.
There was no one in opposition to this Variance
John closed the public hearing
Peg motioned and Jim seconded to approve the setback variance based on the following
criteria:
1. Hardship is met, based on the fact that they tried to do the right thing all along and
was given erroneous information. These errors have compounded throughout the
years. And that this limited the future salability of the property.
2. The BOA could not come up with unique property limitations. They stated that the
limitations were the information they were provided in the past
3. There were no public safety issues
Motion carried
John welcomed Jim Steiger onto the Board of Adjustments.
Peg motion and John seconded to adjourn the meeting, motion carried.